Job Responsibilities of IE | Duties and Responsibilities of Industrial Engineering Department | Garments-Info
Job Responsibilities of Industrial Engineer
industrial engineer job description
|
Day today Basic Jobs
a. Floor
IE meeting.
b. Line
Balancing 7.30am to 9.00am.
c. Production
Board update (Line wise & Main board).
d. Yesterday
Achievement need to inform each line Supervisor & Executive.
e. Today
plan need to inform each line supervisor & Executive.
f. Today
Plan to IE.
g. Operators
regular Interview 9.00am to 11.00am.
h. Bottle
neck solving Using production study document.
i. Capacity
studies.
j. Line
Follow up.
k. Next
day plan to IE (1st Plan before 9.30am, Last update before 10.30am).
l. Lost
Analysis.
Other Special Jobs.
a. Operators
skill matrix.
b. Monthly
& weekly machines requirement.
c. Department
5S.
d. Activity
sampling.
e. Operators
skill training.
f. IE
Training.
Line Feeding
a. New
style line feeding plan.
b. Running
style Ending plan.
c. New
style Zero hours.
d. As
per layout discussion follow up the new style layout.
e. Re
correct the operation balancing if require.
f. If
any new adjustment needs to note down in layout discussion document.
g. Calculate
the line feeding lost.
h. After
feeding meeting with supervisor & technician regarding New style.
Main 6 Things to focus in Every new style
a. SMV
correct or not.
b. Operations
missing or not/ Additional process have or not.
c. As
per requirement manpower allocate or not.
d. Correct
operators in correct place or not.
e. Operator
method correct or not.
f. Additional
Process doing or not (Non-Productive).
New styles Pre-production job duties
a. Before
one week finalize the Operation, breakdown using final PP Sample.
b. Production
team confirmation to OB by signing.
c. Machine
requirement to maintenance.
d. Layout
discussion & Confirmation from technician.
e. If
any process missing need to add discussing with Central IE.
f. If
any additional process needs to remove discussing with Central IE.
g. New
styles check list.
Name of documents need to keep
a. Daily
performances report with Lost Analysis.
b. Monthly
KPI.
c. Production
schedule.
d. Running
Styles (layouts) updated capacity document.
e. Running
styles layouts.
f. All
Procedures (Target setting, Recruitment, Up grading, Etc.).
g. Today
& Next day plan.
h. Diary
for daily records.
i. Running
month all styles FOB document.
After Line Feeding
a. 3rd
day line capacity.
b. Capacity
need to prove minimum 80%.
c. Balance
the line as per actual capacity.
d. Adjust
the SMV if require.
e. Capacity
study document to Supervisor & manager.
f. If
any process low capacity needs to attach issue list with details.
g. Each
operator target needs to inform & note down on machine.
h. Each
style capacity needs to update (Every one week).
i. Follow
up using production study.
Central Jobs
a. Costing.
b. Thread
consumption.
c. Daily
performances report with lost Analysis.
d. Today
& Next day plan.
e. Monthly
KPI.
f. SMV
& thread data base.
g. Monthly
machine requirement.
h. Operation
breakdown.
Nice Thank you.
ReplyDeletehttps://onlinegarmentsacademy.blogspot.com/
Looking for paper bag manufacturing machine? Then we are the best for you, who suit your expectations. We have huge experience on this field. We are 100% dedicated to find you paper bag manufacturing machine.
ReplyDeleteWe are dedicated to manufacturing and sales of a wide range of paper bag manufacturing machine.
You can find here your best one.
If you want to know more, Please check out here: KETE
A debt of gratitude is in order for sharing the information, keep doing awesome... I truly delighted in investigating your site. great asset... job board
ReplyDeleteIn fact, every marketing resource available to the contractor should be utilized to make the corporate web site the best it can be. Although most job boards provide hot links to company web sites, some do not.How to Make cover letter
ReplyDeleteA debt of gratitude is in order for sharing the information, keep doing awesome... I truly delighted in investigating your site. great asset... termtechreview
ReplyDeleteEstablish Plan A and Plan B: I recommend that you always have a plan and a back-up plan. For example, kuala lumpur vs Singapore you may accept a job out of necessity - knowing that it is not a good fit for your long-term career goals.
ReplyDeletePretty good post. I just stumbled upon your blog and wanted to say that I have really enjoyed reading your blog posts. Any way I'll be subscribing to your feed and I hope you post again soon. Big thanks for the useful info. https://europa-road.eu/hu/kombajn-szallitas-gyor.php
ReplyDeleteIt draws upon specialized knowledge and skill in the mathematical, physical and social sciences together with the principles and methods of engineering analysis and design to specify, predict and evaluate the results to be obtained from such systems. Industrial Engineering
ReplyDeletei leaarned something
ReplyDeleteLooking for pad printing machine for your business ? Then we are the best for you, who suit your expectations. We have huge experience on this field. We are 100% dedicated to find you cheap top qulaitypad printing machine.
ReplyDeleteYou can buy pad printing machine here and here are numberius clients buy our products. We are provide only high quality pad printing machine for you with always customers support.
There are many printing feautures avaibale in our stocks.
If you want to know more, Please check out here - Pad Printing Machine for more information.