IE SOP | Standard Operating Procedure of Industrial Engineering Department | Garments-Info

Standard Operating Procedure of Industrial Engineering Department

garments-info,garments-info.com,IE SOP | Standard Operating Procedure of Industrial Engineering Department | Garments-Info,industrial engineering,standard operating procedure,standard operating procedures,industrial engineering (field of study),engineering (industry),work study in industrial engineering,industrial engineering in apparal industry,safety procedures for operating equipment,operating procedure,stay ahead of industry standards and move your operation forward,procedures,textile engineering,working process of cutting
IE Standard Operating Procedure  

Style inquiry and development,

1.    Submit Estimated SMV, Outputs and efficiency levels for pre-costing, pre-planning.
2.    Style feasibility.
3.    Attend for the product development meeting and provide proactive input.
4.    Attend to do the mock ups for approvals on required construction changes.
5.    Calculate and submit thread consumption to the merchandising department.
6.    Submit Estimated SMV, Outputs and efficiency levels for Production planning              
7.    Provide proactive input for efficient production scheduling.
8.    Check and approve production schedules for best options.

Pre-production

9.    Testing and preparation for the confirmed orders.
10. Revive the samples to submit and comments after receive from the sample department.
11. Prepare Operation bulleting and SMV.
12. Issue and discuss operation bulleting with Production and technical staff on processes and process sequence before doing line sample.
13. Attend for line sample with the production and quality staff.
14. Get the confirmation on operation bulleting by the production staff before preparing line layout.
15. Prepare line layouts and discuss and confirm with production and technical staff.
16. Prepare manpower allocation for layouts in advanced to the line feeding.
17. Prepare skill inventory and skill requirement for each style.
18. Prepare and attend on skill development for style based critical operations (Training in advanced).
19. Maintain worker skill inventory
20. Prepare and attend on general skill development plan,
21. Prepare fresher training manual.
22. Supervise fresher training and training center activities.
23. Prepare machine, attachment and manpower requirements based on latest production schedules- only style wise.
24. Make and follow line feeding plan.
25. Follow up and make sure to available required machines, attachments and manpower on time as style feeding plan.

Line feeding/New style introduction

26. Attend in new style introduction
27. Instruct and train workers on correct methods as motion sequins include in desired SMV.
28. Arrange for best work place arrangements as method desired on SMV with maintaining a style check list.
29. Explain the SMV, Targets and plan efficiency levels to each and every worker.
30. Play an active role on reducing line feeding losses.
31. Maintained line feeding report
32. Attend for style first bundle meeting.

Running Production and day to day works

33. Capacity study of all layout/Operations at two to three days after feeding
34. SMV revision and confirmation with comparing the capacity after complete the capacity study.
35. Make potential plans after capacity study.
36. 1st line layout re-balancing based on actual capacities and as per potential plan.
37. Attend in daily line pocket meeting
38. Attend on daily line balancing
39. Find the bottle necks, technical and quality issues and attend to solve with addressing to the responsible persons
40. Interval capacity study and line layout re-balancing once a every two weeks time in first month and once a month after first month.
41. Plan and attend in Continuous Training for workers.
42. Attend in Continuous method improvements and SMV reductions.
43. Organize and conduct daily efficiency meeting with production staff.
44. Monitor and record individual and line off standard times and take necessary actions to reduce the lost times.
45. Achieve planed production targets and line efficiencies.

Post Production    

46. Style reconciliation of - technical (SMV, Efficiency, Production output, Thread consumption, Production plan, Bottlenecks).
47. Monitor the style reconciliation of received to ship.
48. Monitor the post costing

General

49. Performance evaluation of workers and factory staff. Do the grading.
50. Introducing and monitoring incentive schemes/Motivation tools.
51. Management update on latest management concepts, Technology, systems and procedures, methods, tools and attachments.
52. Maintain and achieve the targets of key productivity indicators and do the comparison with other industries for management information.
53. Maintain all filing and document systems
54. Special tasks/Projects assign by management
55. Attend for management meeting and give proactive inputs
56. Self-training and maintain records of achievements (individual & department)

9 comments:

  1. For example, drills are the sort of intensity tools that one by and large utilized for all-round works, with no region which helps the utilization of the drills.Suncoast Precision Tools

    ReplyDelete
  2. thank you for your interesting infomation. buy digital prints

    ReplyDelete
  3. I would like to thank you for the efforts you have made in writing this article. I am hoping the same best work from you in the future as well. Thanks... Na spletni strani o tem

    ReplyDelete
  4. His work, like others, covered topics such as the organization of work by management, worker selection, training, and additional compensation for those individuals that could meet the standard as developed by the company through his methods. Industrial Engineering

    ReplyDelete
  5. Thus, homegrown speculators and organizations (Nigerians) presently have the chance and huge task to carry out in the feasible development and advancement of Nigerian oil and gas industry. Industrial Asbestos Removal

    ReplyDelete
  6. I will do niche blog comment Just in 5$ .All comment relevant with your niche and UNIQUE .This off-page seo will increase your traffic and promote your business. Industrial Engineering

    ReplyDelete
  7. Hey what a brilliant post I have come across and believe me I have been searching out for this similar kind of post for past a week and hardly came across this. Thank you very much and will look for more postings from you. Industrial Engineering

    ReplyDelete
  8. Low Bidders are destroying the Glass Repair Business. For those who are looking to get a business repaired after vandalism or having your glass windows broken, looking for the lowest bid may not be the best bet. Many industries have those who take shortcuts, but the glass repair industry has such a huge amount of bad service people that it has given the whole industry a bad rap. AC Motor Construction

    ReplyDelete

Powered by Blogger.